top of page
Single Phase vs Three Phase Power: Which Does Your Site Need?
If you're organising temporary power for a construction site, one of the first questions is whether you need single phase or three phase. Getting it right avoids delays and unnecessary costs. Single phase power runs on one active wire and is generally suited to smaller residential builds — running hand tools, lighting, and general site amenities. It's the more common (and typically cheaper) option for standard home construction. Three phase power delivers power across three a
admin496837
Sep 211 min read
Overhead vs Underground Power Connections: Pros, Cons & Cost Factors
Temporary power poles can be connected either overhead or underground, and the right choice depends on your site conditions, layout, and budget. Overhead connections run power via aerial cabling from the street connection point to your pole. They're generally quicker and more cost-effective to install, since there's no trenching involved. They work well on sites with clear overhead access and no conflicting infrastructure. Underground connections run cable below ground level.
admin496837
Sep 211 min read
How Long Does It Take to Get Temporary Power Connected to a Building Site?
Timing matters when you're coordinating trades and can't afford for power to be the thing holding up your build. Here's what affects how quickly a temporary power pole can be installed. Typical turnaround: most installs can be arranged within 2-5 business days of booking, and we can sometimes manage same-day installs depending on availability. The more notice you can give us, the more flexibility we have to fit your preferred date. What affects the timeline: Site readiness (c
admin496837
Sep 211 min read
bottom of page